Dredging at Jurong Port, Singapore

By Joseph R. Fonseca
Saturday, July 26, 2014
Jurong Port, Singapore

 

Dredging work will be carried out at Keppel Shipyard Benoi Road, off West Jurong Channel, from 28 July to 30 September.

As per the Maritime and Port Authority of Singapore Port Marine Notice No.98 of 2014, the works will be conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):

A) 1° 17.880'N / 103° 40.914'E

B) 1° 17.845'N / 103° 40.929'E

C) 1° 17.796'N / 103° 40.823'E

D) 1° 17.831'N / 103° 40.807'E

Dredging works will be carried out by the grab dredgers. The grab dredgers will be held by 4-point anchoring system and each anchor position will be marked by a yellow buoy, Fl Y 3s.

The dredgers, with hopper barges in attendance, will have a circular safety working zone of 50-metre radius centred at the dredgers. Dredged materials will be transported to the designated dumping ground by the hopper barges.

During the operation, the dredgers will be attended by tug boat. The tug boats will be used to shift the dredger.

A safety boat will be deployed in the vicinity of the working area to warn other craft of the project.

Craft involved in the works will exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:

(a) Keep well clear and not to enter the working area;

(b) Maintain a proper lookout;

(c) Proceed at a safe speed and navigate with caution;

(d) Maintain a listening watch on VHF Channel 22 (Jurong Control);

and

(e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.

 

GAC Singapore at singapore@gac.com


 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

HMAS Success Deploys to Middle East

After months of preparation, HMAS Success departed Garden Island in Sydney today for a six-month deployment to the Middle East Region to provide logistic support

Rosneft Ships First Oil From Chayvo Field

Rosneft commenced shipment of crude oil extracted at the Northern Tip of Chayvo license off the coast of Sakhalin, with the first tanker carrying Sokol-grade crude leaving port on November 21.

Houston Port Commission Approves budget

The Fiscal Year 2015 Operating and Capital Budget was approved Thursday during a special meeting of the Port Commission of the Port of Houston Authority.   Projections

News

ST Engineering Rejigs Top Deck

Singapore Technologies Engineering Ltd (ST Engineering) today announced the appointment of senior management personnel to new key management positions in the

HMAS Success Deploys to Middle East

After months of preparation, HMAS Success departed Garden Island in Sydney today for a six-month deployment to the Middle East Region to provide logistic support

Rosneft Ships First Oil From Chayvo Field

Rosneft commenced shipment of crude oil extracted at the Northern Tip of Chayvo license off the coast of Sakhalin, with the first tanker carrying Sokol-grade crude leaving port on November 21.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2195 sec (5 req/sec)