Dredging at Jurong Port, Singapore

By Joseph R. Fonseca
Saturday, July 26, 2014
Jurong Port, Singapore

 

Dredging work will be carried out at Keppel Shipyard Benoi Road, off West Jurong Channel, from 28 July to 30 September.

As per the Maritime and Port Authority of Singapore Port Marine Notice No.98 of 2014, the works will be conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):

A) 1° 17.880'N / 103° 40.914'E

B) 1° 17.845'N / 103° 40.929'E

C) 1° 17.796'N / 103° 40.823'E

D) 1° 17.831'N / 103° 40.807'E

Dredging works will be carried out by the grab dredgers. The grab dredgers will be held by 4-point anchoring system and each anchor position will be marked by a yellow buoy, Fl Y 3s.

The dredgers, with hopper barges in attendance, will have a circular safety working zone of 50-metre radius centred at the dredgers. Dredged materials will be transported to the designated dumping ground by the hopper barges.

During the operation, the dredgers will be attended by tug boat. The tug boats will be used to shift the dredger.

A safety boat will be deployed in the vicinity of the working area to warn other craft of the project.

Craft involved in the works will exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:

(a) Keep well clear and not to enter the working area;

(b) Maintain a proper lookout;

(c) Proceed at a safe speed and navigate with caution;

(d) Maintain a listening watch on VHF Channel 22 (Jurong Control);

and

(e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.

 

GAC Singapore at [email protected]


 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Sea Star Continues Puerto Rico Investments

Sea Star Line, LLC has entered an agreement to on-hire another barge to add to its current service package for shipments from Jacksonville to Puerto Rico.   The

Rand Logistics Announces Debt Refinancing

Rand Logistics, Inc. announced today that it has closed a $170.0 million revolving loan facility which refinanced approximately $102.0 million of the company's

Rotterdam Gate LNG Terminal Expansion Started

Dutch gas network operator Gasunie and tank storage service provider Vopak said on Monday that the expansion of their Gate liquefied natural gas (LNG) terminal in Rotterdam has begun.

News

WOW at USMMA

The United States Merchant Marine Academy Hosts 7th Annual Women on the Water Conference. Last week, The United States Merchant Marine Academy (USMMA) in conjunction with the U.

Methanol Powered Ferry Launched in Baltic Sea

Swedish ferry operator Stena Line has announced that it has converted the Stena Germanica to run on methanol, an industry first.   The company spent $24 million on converting the ship to methanol.

U.S. Oil Train Traffic mostly from Midwest to East Coast

U.S. oil trains delivered more than 13.5 million barrels of crude oil from the Midwest to the East Coast in January, according to government data that gives a first

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4610 sec (2 req/sec)